Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2530

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
男女特爽av| 干B视频国产 欧美一区二区三区| 国产亚洲精品潮吹20p| 亚洲伦理日韩在线播放| 日韩黄片视频在线观看| 操逼逼淫水直流| 久久精品国产亚洲免费| 啪视频高清视频在线观看| 亚洲无码欧美一区二区三区| 亚洲欧美精选视频| 亚洲欧美不卡视频| 久色精品| 国产 欧美 调教 颜射| 665566亚洲日韩精品| 午夜精品123区| 久久婷婷色怕| 国自拍区一区| 美乳教师在线| 亚洲日韩小说区视频区| 中文 国产亚洲日韩| 亚州av小说| 丁香五月秘 在线播放| 免费看男女尿尿视频| 女口大鸡巴免费网站| 91国产成人一| 中文无码一区二区不卡AV| 日本久久久久久久做爰片日本| 国内外精品视频刺激在线| 欧美黄频| 日韩av伊人射满嘴| 黄色麻影院| 男女日b一区二区| 亚州,欧州无码视频| 尤物看片视频免费| 黄色激情成人网站| 一区二区自拍日韩| 日本久久精品一二三四| 亚洲Aⅴ天堂在线| 亚洲一区 激情综合| 痴女在线一区熟女| youyousese|