Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:3032

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
亚洲AV网站在线免费观看| 麻豆日韩国产一区二区| 亚洲 成人 熟女人妻| 久久8爽一爽| av综合一下| 久久精品无码一区二区麻豆蜜臀| 91不卡不卡| 欧美久久欧久久| 日韩精品六区| 五十路先锋人妻| 小视频日B| 91后入合集| 国产后入少妇人妻高清| 久久成人免费日本| 天天看天天摸天天操BB| 人人干天天干天天操| 97久久伦理| 国产三级视频99| 性色AV无码久久一区二区三| 日本性爱麻豆影视| 就要香蕉视频三区| 在线日本二v不卡| 亚洲欧美综合色| 欧美自拍视频综合| 日韩AV无码小黄片| 亚洲av 黄色小说| 日韩AV第一二区| 欧美综合色色色| 99久久兔费国产精品| 丁香花激情啪啪一区二区三区| 国产欧美精品免费观| AV美女在线在线在线| 暴c内射中出人妻少妇| 91一区二区三区视频| 六月综合在线观看| 亚洲综合丝袜美腿亚洲综合| 亚洲无码夜夜操| 天天操天天日天天干天天撸一级 | AV伦理站在线播放| 人妻,乱在线| 欧卅熟妇色|