精品人妻少妇一区二区三区,亚州视频a,五月天开心激情成人婷婷,久久永久精品网站视频

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.eganrpc.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2935

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
日韩.欧美.亚洲一区二区三区| 国产乱婬AV麻豆国产| 99爱视频在线| 六十路人妻网址| 操逼网址啊啊啊| 天天黑料福利视频在线| iporn国产热在线| 朋友妻出轨性爱视频网站| 日韩激情1区2区3区| 青青久久av北条麻妃黑人| 天堂久久成人| 亚洲精品蜜桃| 欧美色图另类天天更新久久久久久| 这里只有精品视频久久99| 午夜av一二三| 欧美A∨久久| 美国熟妇日逼| 久久在线观看| chinese麻豆国产91| 久久精品国产亚洲AV麻豆花絮| 久久久天堂在线| 欧美日韩午夜精品不卡综合妖精 | 亚洲欧美日韩操比| a无无码一区二区三区| 欧美日韩国产成人小说| 国产欧美一区激情好日子 | 夜夜嗨aⅴ人人妻| 欧美成人秋霞久久AA片| 99无码中文| 日本啊啊啊啊| oumeixingaiyique| 蜜臀亚洲AV无码精品国产午夜.| 最新国产人兽AV观看| 久久三级久久国产| av看黄色在线| 国产少妇一区| 色一区二区三区四区网| 超碰91制品| 欧美日韩huang| 网站一区| haodiaose欧美|