Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3302

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产日韩av在线一区| 欧美一区二区不卡视频能免费观| 国产a毛片| 欧美WWW138一区五区B区| 日本久不久久| 巨乳熟女一区| 久久99日本视频| 精品一二区中文字幕| 人妻激情偷乱二区三区| 黄色电影一区二区三区| 日韩瓶小视频在线观看视频| 亚洲va在线∨a天堂va欧美va| 国产91精品自慰| 国产AV片无码| 射射射久久| 免费成人黄色小说网站| 久久经典麻豆| 男女激情视频在线观看| 日本午夜免费福利视频| 六色综合成人网| 全黄性高潮视频| 久久久日B的视频| wwww国产日本| 色1晴一区二区三区| AV片一区二区三区紫牛| 大香蕉在线视频六九| 色逼视频网站首页| 亚洲色浴15p| 中文无码一二三区| 精品国产亚洲AV妓女| 国产欧美porn| 久久综合久中文字幕| 一级片插美女逼里一阵操| 亚洲中文字幕女同系列av专区| 一区二区三区成人电影| 黄色精品一区二区三区色| 亚洲三区一区| 熟女第一页一区| 91大神版在线看| 国产日韩专区欧美麻豆| 台湾佬中文成人网|