精品人妻少妇一区二区三区,亚州视频a,五月天开心激情成人婷婷,久久永久精品网站视频

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.eganrpc.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3530

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
久久久sabji| 激情五月欧美视频区| 自拍偷拍麻豆第一页| 亚洲人性生活视频网站在线观看| 日小b视频| 中文人妻一区在线| 亚洲色久悠悠综| 黄色福利视频在线| 日韩在线不卡二区| 日韩免费激情在线视频| 黄发美女操B大片| 粉嫩精品在线国产| 日韩高清熟女| av依人大香蕉| 老熟女成人| www.欧美老熟妇.com| 亚洲日狠摸久久人人| 色在线高清无码| 久久婷婷亚洲中文| 日本色产免费在线视频| 欧美日韩精品一区二区三区污污污| 国产欧美日韩国产在线| 好想干你激情视频| 国产一区二区三区四区五区久久| 搜索999国产1级毛片| 精品久久天| 外国美女被操逼。| 婷五月天色AV| 鸥美精品一区二区久久婷婷| 偷拍美女在线| 亚洲日韩欧美豆麻| AV成人精品午夜| 日本三级一区在线| 国产亚洲一区二区三区在线播放| www.亚洲剧情av| 亚洲成人AV在线一区| 日本中文字幕熟女一区二区| 夫妻性生活黄色毛片视频| 国产精品原创区| 伊人大香蕉电影| 黑人大鸡巴操中国少女视频|