精品人妻少妇一区二区三区,亚州视频a,五月天开心激情成人婷婷,久久永久精品网站视频

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.eganrpc.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:3645

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
日韩无码不卡久久久久| 亚洲国产性生活网站| 爆乳久久精品爆| 美女天天插| 丝袜伦理诱惑日韩| 亚洲 国产 欧美 日本 韩国| 青青久久A天堂| 无码日韩欧美一区二区三区| 亚训伊人精品| 日韩成人一区小说| 免费亚洲色| 在线观看免费黄色小说| 国产情趣一区二区| 蜜臀aV一区二区三区绯色| 最新中文字幕在线一区二区三区| 久久久国产剧情| 中美日韩成人在线不卡免费高清观看| 不卡国产123| 成人一区二区欧美| 猛攻小穴无码| 天天爽天天捅天天干| 国产日产亚洲丝袜| 午夜无限制福利视频| 久久精品欧美日韩国产一区二区| 大陆插b免费视频| 香蕉视频精品一区二区三区| 中文字幕13女同另类| 一区二区三区aⅤ| 中文字幕人妻熟女美腿丝袜| 日韩少妇内射在线| 超碰caoporn98| 少妇后入100p| 伊伊高清美女AV在线| 亚洲欧美日韩在线激情| 国内又粗又长又大又黄| 精品工厂av深夜福利| 国产伦理视频福利资源| 女女同性女同一区二区三区91| 区欧美性TV| 欧美呦呦一区二区| 人人操人人操人人草人人 |