Foshan General Steel measuring program

Time:[2016-7-6]  Hits:4390

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
天天射天天干黄站| 欧美激情com| 精品99A区| 亚洲国产天堂久久综合| 91 视频蜜臀一区二区| 欧美一级大黑吊| 国产精品久久久久久Av无码免费| 日韩大又长又租又大| 欧美日韩综合五区| 午夜福利网片| 精品黄色影院| 青娱乐频道久久婷婷香蕉| 啊我啊 好爽视频| 亚洲国产综合色在线视频| 中文字慕综合| 欧美丝袜熟女综合| 女同一区二区中文字幕| 日韩老熟妇在线| 在线韩国成人视频| 五月天激情四射亚洲婷婷| 夜福利激情视频在线观看| 日韩激情高清在线| 日本夫妻性生活视频网址| 国产老师在线视频在线观看网站| 亚洲一区二区超碰在线一区| 啊…啊…操我视频| 黄频在线免费观看免费| 久久人人爽人人爽Av5| 国产后入少妇高清| 欧美电影亚洲电影成人小说主播| 久久国产日本免费| 89AV久久久| 人人妻韩国日本| 日韩一级淫片| 欧美色吊图| 欧美高清二区在线网| 无码精品人妻一区二区中文| 国产日韩AV在线观看了| 麻豆视频一二区视频| 女人高潮抽搐喷液10分钟视频| 启东市|