Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:5137

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
亚洲福利在线观看观看| 国产av黑人专区| a天堂在线69| 欧美人妻性生活| 久久人体国产| 亚洲区角av| 视频一区二区在线不卡| 欧美成人网站在线欢看| 精品女同av一区二区三区| 欧美3级在线| 亚洲综合图片小说| 久久亚洲毛片精品| 婷婷色色婷久久久| 乱伦视频精品网| 18禁裸体美女网站久久| 香蕉久久噜噜| 成人小说视频免费观看| guochanlaosaobi| 午夜福利视频在线1| 中文 无码一区| 夜夜操天天干| 国产视频16p| 综合网五月天| av福利片子| 在线观看国产一区二区| 了级久久黄色片| 久久国产插| 欧美日韩国产论坛| 久久精品一二欧美无婷婷| 日韩 亚洲 欧美 激情| 酒店少妇自拍| 爆操丝袜熟女| 欧美影院一区二区三区 | 欧美福人毛片| 欧美日韩中文字幕黄片| 亚洲美女中文字幕年轻漂亮久久| 日韩在线影院播放一区| 欧美白鸡巴性男女| 男人日女人黄片视频| h日韩欧美在线| 日本黄色99|