welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
色色呦呦视频免费在线观看| 精品福利视频三级福利视频三级| 大香蕉久久久精品| 大香蕉久久精彩视频| 大鸡巴日逼图片| 欧美日韩人妻交换| 日韩欧美97| 成人激情瑟瑟亚洲综合国产| /欧美国产日本精品一区二| 河北彩伽中文在线一区二区| 久久精品女同国产99老湿机| 三上悠亚久久精品中文字幕| 新91麻豆| 亚洲电影午夜| 五月丁香综合久久| 99人妻人人爽人人操人人精品| 日韩国产欢在线观看| 爆口吞精九九九九九九| 一本色道久久99精品综合| 亚洲www成人网站在线观看| 日韩伦理视频网址| 女丝袜久久诱| aⅤ天堂网无码在线| 颜射网综合| 骚货1区2区3区| 日本一区二区不卡二区| 黄色片成人国产| 99黄色艹B| 新搬来的白领邻居国产巨作| 日韩产的人妻AV在线网| 国产九九热‘| 亚洲第一论坛综合一区二区3区| 中文字幕字幕中文在线中不卡视频| 第一区人妻| 欧美成人在线观看国产不卡| 少妇高潮网址| 小少妇久久久| 亚洲 国产 另类 图片| 国产精品视频分类视频3| 91久久夜色精品国产按摩| 色小说在线免费观看|