Housing Construction - large steel structure construction technology of installation of slip

Time:[2016-3-19]  Hits:4733

Guangzhou Steel tells you: Housing Construction - large steel structure construction technology of installation of slip

Guangzhou Steel News 1. Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of construction plan
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
男生的鸡巴插入美女的小穴免费电影| 日韩日韩日韩欧美日韩在线观看视频| 久久久人妻精品无码| 日韩精品 欧美潮吹| 日韩欧美成人在线免费观看 | 欧美日韩国产成人专区| 91 18视频| 欧美精品一区二区二区二| 国产无码高清在线观看一区| 美女午夜福利在线| 欧美伊香蕉久久综合网99| 91在线一起草| 欧美日韩亚洲一二三| 狠狠色综合久| 色呦呦在线午夜| 高清射精国内大片在线播放| 欧美舔骚逼的视频| xxxx少妇后入内射| 精品爆乳久久综合| 亚洲无码第二十页| 日韩一区伦理在线网站| m1313国产精选一区二区三区| 国产换妻在线播放网址| 国产极品啪啪啪啪啪| 精品久久久久久av| 久久久久日韩| 插啪啪综合| 人人看AV免费网站| 日韩中文字幕在线看| 香蕉Av超碰| 岛国Av不卡一区二区在线| 美女特级精品毛片| 草网站在线观看| 中文字幕人妻漫画| 国产综合欧美另类| 刘玥偷拍一区二区三区视频| 99精品国产免费| 国产欧美在线一区导航| 日韩第一页中文字幕精品| 亚洲无码中文字幕日韩| 麻豆一区二区三区四区五区六区七区|