精品人妻少妇一区二区三区,亚州视频a,五月天开心激情成人婷婷,久久永久精品网站视频

Language:CHINESESENGLISH

Home > News > Steel construction work Technical Exchange
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.eganrpc.cn

Steel construction work Technical Exchange

Time:[2016-3-5]  Hits:5129

Guangzhou Steel News: Steel construction work Technical Exchange


Tests, content:
1. Guangzhou Steel construction personnel should be familiar with this type of work safety rules and technical skills to work, conduct disorder safety tests, education, job before the job is not suited to high-altitude, high-altitude operations personnel can not engage in prohibited entering the construction workers must be used correctly personal protective equipment. Qualified to wear helmets, fasten your chin buckle locking good. Climbing (2m or more) must wear seat belt hanging qualified jobs, with low hanging hung securely. Forbidden to wear slippers or plastic-soled shoes high-altitude operations, Do not drink and work.
2. electric welding operations, to holders of operating permits, fire permits and clean up around the inflammable and explosive materials, oxygen, acetylene bottles spacing distance should be consistent with the work specifications, welding wire should be in place, staffed with qualified and effective fire-fighting equipment , set up specifically to see the fire. Welder by a professional electrician complete disassembly, and what does not prohibit the operation of machinery and equipment.
3. Do not live operation, with a load connected to power lines is prohibited.
4. climbing operations must be worn tool bag, wearing non-slip shoes, tools, tool bag should be placed, not free on a steel beam or a place easily lost if the handheld tools (such as hammers, wrenches, pry bar, etc.) to put on a safety rope to prevent the loss hurt.
5. Field workers smoking, chasing. Special types of work must be certified.
6. Non-professionals shall not engage in electrical work, temporary overhead power lines laying, and good insulation measures to prevent scratch, hit, hit cable.
7. sling must be checked before use, do not meet safety requirements prohibited.
8. The lifting work full-time workers command signal, high lifting must be clearly visible semaphore or flute and intercom command, to be set up at the sight of two blind lifting operations command.
9. hanging objects at 0.3m from the ground when the lifting rigging inspection, determined safe before lifting, and crane overload operation is prohibited.
10. When lifting member, non-stop or put the container member scattered Unloaded member.
11. At the bottom of the arm member and play a major twist area, may not have staff to stay around.
12. The pull member seated in the cable should help in place, this time staff member should stand on both sides.
13. member in place, should be a fixed installation or post weld welding, non-use of temporary stacking, hold way to prevent accidents and falls from a height, must be firmly welded in place immediately after.
14. Canton steel operations use electrical equipment, to be done to stop people walking machines wind up its power before they can not stay hidden.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
在线高清欧美综合一区| 女生被操网站在线看| 日韩日日日干干干| 国产伊人久久网| 透B视频免费看| 人妻少妇1| 久久久久久久久一区三寸婷婷撸大师| 在线韩国成人视频| 西西视频| 五月婷av在线观看| 黄色成人AV网站在线看| 看真人舔比视| 日本成人影暖| 国内激情黄色| 日韩不卡顿久久香蕉视频| 99视频免费在线| 大鸡巴逼视频下载| 麻豆国一`区二区| 国产欧美日韩小说成人| 日本一区二区三区蜜桃| 欧韩香蕉视频观看| 久久极品网站| 国产拍偷一区| 麻豆传媒成人在线视频| 欧美久久久久久久不卡视频| 日韩人妻不卡免费视频| 欧美麻豆黄片| 蜜臀AVwww| 五月天无码久久久久| 国产一区二区COS污污| 亚洲人妻在线影院| 少妇人妻偷人精品无码视频九| 一区三区网站| 亚洲调教处女在线免费| 久久AV在线电影观看| 亚洲AV午夜福利精品久久| 夫妻射精免费视频| 日韩成人黄色影院| 欧美性生活视频内部射精| 日韩AV电影一卡二卡三卡| 麻豆人妻一区|