精品人妻少妇一区二区三区,亚州视频a,五月天开心激情成人婷婷,久久永久精品网站视频

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.eganrpc.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:5089

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
伊人久久福利视频| 深夜 91九九九| 熟丝舞一二区| 簧片视频欧美| 男人的天堂狠狠插| 国产精品视频五区| 日本高清最新高清无码专区| 亚洲综合素人性爱| 免费在线观看抠b| 欧美 国产 精品 免费中文| 超级碰碰碰香蕉国产| 人人插天天操| 1級國產成年人| 久久美女免费电影| 91色色欧美日韩| 欧美国产欧美综合韩日| 日日一区二区AV| 原创网AV资源| 五月丁香婷婷播放| 国产经典三级久久久| 亚欧美韩中文字幕| 中文字幕色站| 91精品国产一区二区无码蜜臀a| 美女Av免费网站| 国际AV在线播放| 白虎h极品资源| 91无码免费观看| 福利很操小逼| 大鸡巴干亚洲女人| 国产,另类,欧美,一区二区| 日韩人妻xXXX| 精品自拍偷拍AV| ts人妖| 国产 成人 图片| 欧亚免费视频| 在线亚洲视频91| 亚洲 图片 网站久久| 国产精品69久久99| 超碰99亚洲99| 欧美两性免费生活| 不卡三四区|