Steel supervision next station control points

Time:[2016-1-20]  Hits:5014

Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
有码砖区| 无码精品福利视频| 大鸡吧狠狠操骚妇| 后入av养殖| 久久 人妻 白丝 白虎| 久久一片黄| 狠狠噪夜夜躁| 亚洲精品 日韩精品 欧美精品| 国产成人一区二无码| 中文字幕人妻一区二区三区网站 | 日韩噢美一级片| 女生和男人12av另类视频| 亚洲成人一区二区久久| 国产成人精品一区在线播放| 日韩色哟哟在线| 亚洲欧美色偷拍| 日韩三级一区在线观看| 人人妻人人艹| 午夜啪视频在线免费观看| 色吧AV一区二区三区| 18 国产麻豆一区二区| 96欧美一区二区三区| 国产日本精品123区| 本庄优花AV一区二区三区| 久久久伦理精品免费免费| 亚洲高清av小说| 小日本操逼的| 熟女人妻乱交精品| 一区二区人人操在线| 99国产欧美久久久| 北京熟妇二部| 日本免费毛片影院| 亚洲高清四区五区| 91含羞草麻豆成人大全| 欧韩日旅游无码| 国产精品电影后入内射| 色先久久久久| 三级精品区| 女女同性女同一区二区三区按摩| 99久久亚洲精品日本无| 亚洲国产精品久久一区二区|