1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:5062

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
超碰午夜福利影院| 欧美女同大黄片| 亚洲AV人无码综合在线观看| 人妻内射电影| 国产无码一区二区八戒| 日韩欧美一区二区三区中文字幕新| 免费无码日B短视频| 国产熟女免费网站| 中文字幕在线观看不卡综合一区| 99re在线播放视频| 超碰国产亚洲在线| 精品熟人妻在线| 欧美乱伦第一区| 小说一区婷婷五月天久久| 天天射精品视频| 人妻蜜与肉| 91偷拍中文字幕| 亚洲精品天堂a 在线www| 国产 成人 综合 亚洲| 成人不卡视频在线观看| 日韩国产在线第一页| 久久精品剧情免费| 久久97蜜桃| 亚洲日本福利视频| 亚洲第一欧美激情| 国产性欧美一区二区不| 艹逼在线免费看| 日本久久理伦片| 一木道九九九九久久久久| 色呦呦呦呦呦呦呦呦呦呦呦呦呦呦呦| 裸体美女视屏麻豆| 久久久久999视频9999| 中文字幕射精一区| 城口县| 成人拍拍动态| 亚洲成成人系列| 日本三级天天在干| 亚洲性感操逼视频| 国产精品免费看片一区二区| 自拍视频欧美| 亚洲成人系列|