Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2409

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
日本天天日日天天添| 欧美性感淫妇国产| 天天艹天天艹天天艹| 性久久激情| 麻豆文化传媒精品一区观看| 少妇人妻av一区二区| 亚洲精品88| 久久婷婷五月亚洲精品| 亚洲黄色福利视频网站| 日韩欧美中文字幕专区| 91精品国产色综合久…| 美女被的鸡吧操的视频| 日韩夜夜夜一区二区三区 | 日韩一二三区影祝午夜福利| 欧头一区二区| 妇女激情激情基地| 国产精品啪啪啪免费大全 | 色色色综合国产精品| 美女黄色综合美女黄色| 综合久久久天堂网| 男生操女生下面的视频网站| 一区二区三区影院一起草| 国产亚洲综合一区二区| 色悠悠色综合网| 免费看美女脱光衣服的91N网站| a99成人网站| 欧美日版黄片| 麻豆一级av| 大香蕉伊人一道本| 后入清纯少妇| 成人久久金久久噜| theporn久久久| 逼白浆视频| 亚洲 欧美 日韩 国产图片| 国产精品欧美在线观看地址| 一天天干天天操天天干天天操天天| 老色鬼网潮吹| 日本少妇吃鸡巴| 天天透一区二区三区| 久久国产乱子伦精品在线观看| 乱系列久久|